Home / Nepal / Beni-Jomsom Road Resumes

Beni-Jomsom Road Resumes

Beni-Jomsom Road Resumes
– Nepalayatimes

Beni-Jomsom Road Resumes
Beni-Jomsom Road Resumes

Myagdi – The Beni-Jomsom road that connects the trans-Himalayan district of Mustang with the rest of the country has been opened for traffic after four days of disruption.

The road was blocked after a dry landslide occurred at Guithebhir of Annapurna rural municipality-3 in Myagdi district. The road was obstructed by the landslide debris deposited on the highway since December 27.

WATCH VIDEO

The 76-kilometer-long road was opened for traffic after the landslide debris was cleared on Monday evening.
Vehicles bound to Jomsom from Beni and vice-versa were stranded after the obstruction of the road by a landslip.


Meanwhile, traffic along the Beni-Jomsom road is to be stopped for eight hours daily for carrying out upgrading and expansion works. Vehicles would be stopped from operating from 7.30 am to 11 am and from 2.30 pm to 6 pm, chief of Beni-Jomsom Road Upgrading Project, Mukunda Adhikari, said.

READ MORE . . . .. .

MOST LIKED TREKKING ROUTE

POPULAR TREKKING AREAS

Check Also

Mahakali Municipality Prepares Tourism Plan

Mahakali Municipality Prepares Tourism Plan

Mahakali Municipality Prepares Tourism Plan – Nepalayatimes Kanchanpur – The Mahakali Municipality of Kanchanpur has …

Leave a Reply

Your email address will not be published. Required fields are marked *